• Home

  • About Us

  • Business Ecosystem

  • Industries

  • Blog

  • Contact Us

Quote Now


Solutions for Your Industry, Ready for Your Choice

%{tishi_zhanwei}%
  • Three-phase energy storage system
Three-phase energy storage system
+
  • Product Detail
  • Hybrid Inverter Model

      BLUESTAR-INVERTER-IP-05K-EU BLUESTAR-INVERTER-3P-10K-EU
    Maximum Continuous PV Input Power 6.5kW 20kW
    Number of MPPT Trackers 2 2
    Maximum Input Current per MPPT 15A 15A
    Rated AC Output Power 5kW 10kW
    Rated AC 230V,50/60Hz 400V,50/60Hz
    Battery Capacity 100-400 Ah 200/400/600/800 Ah
    Dimensions (W x H x D) 540x590x240 mm 540x980x240 mm
    Weight 32kg 49kg
    Communication RS-485/CAN 2.0/WiFi/4G RS-485/CAN 2.0/WiFi/4G
    Display LCD/APP LCD/APP

    Battery Model

    Battery Type LFP (Lithium Iron Phosphate)
    Weight 54kg
    Dimensions (W x H x D) 540 × 490 × 240 mm
    IP Rating IP85
    Warranty 5-Year Product Warranty
    Energy Capacity 5.12kWh
    Rated Voltage 51.2V
    Cycle Life 10000 cycles

    Product Highlights

    Safety
    • CATL Lithium Iron Phosphate Battery
    • Safe and reliable, 10-year warranty
    Simple
    • Integrated design, multiple battery expansion, 30-minute quick installation
    Intelligent
    • Intelligent energy management system, real-time monitoring via global application or network

Honor


Providing Our Customers with Best Services

Served over 300 customers from 20 countries

Established cooperative relations with well-known domestic enterprises such as State Power Investment Group Co., Ltd. and set up a foreign trade department to expand trade cooperation in more than 20 countries and regions in Europe, Southeast Asia and other places.

Qualifications

Qualifications

CE certificate

CE certificate

Qualifications

Qualifications

Qualifications

Qualifications

TUV certificate

TUV certificate

Hebei Province Industrial Enterprise R&D Institution Certificate

Hebei Province Industrial Enterprise R&D Institution Certificate

Demonstrative unit of carbon neutrality commitment

Demonstrative unit of carbon neutrality commitment

Solar product certification

Solar product certification

Solar product certification

Solar product certification

Quality Management System Certification Certificate (English)

Quality Management System Certification Certificate (English)

FAQ


Lead time?

The order lead time is need 15-25 days after receiving deposit.

How can I start the order?

We can send you the proforma invoice with our bank details. After we received the down payment, we will start the production.

Do you have after sales support?

Yes, we have rich experience in handling after-sales issues via video or email. 

Can we ship it in a timely manner?

We have a massive inventory that can be shipped in a timely manner

Introduce


Hebei Siqian New Energy Technology Co., Ltd. was established in 2016 with a registered capital of 106 milion yuan. The brand is "Siqian New Energy', headquartered in Laiyuan Economic Development Zone, Hebei. The company has been rated as national high-tech enterprises, specialized smal and medium-sized enterprises, excellent private enterprises.

Production equipment (8)
Production equipment (7)
Production equipment (6)

  • Three-phase energy storage system
Three-phase energy storage system
+

Three-phase energy storage system

Maximum continuous PV input power: 20 kW Number of MPPT trackers: 2

The company's product  can be customized according to demand, if there is demand, please contact us!

Immediate consultation

If you are interested in our products, please leave your email, we will contact you as soon as possible, thank you!

Submit Message